Hydro-electric feasibility study at Upper Pony Creek Reservoir
Download pdf
This archived document is maintained by the State Library of Oregon as part of the Oregon Documents
Depository Program. It is for informational purposes and may not be suitable for legal purposes.
Abstract/Description: | A technical, fiscal, and permitting feasibility study has been conducted for the Coos Bay North Bend Water Board pertaining to the development of hydroelectric facilities at the Upper Pony Creek Reservoir. A net-metering design for onsite use of the generated power model was selected based on projected power generation rates. The pro-forma for the project developed to reflect the preliminary build-out design, historical electricity inflation rates, and currently available tax credits and utility incentives projects a return on investment of greater than 15 years. An alternate operational scenario based on moderate industrial growth flow rates was also investigated. |
---|---|
Subject(s): | n-us-or Hydroelectric generators -- Oregon -- Coos Bay Water-power -- Oregon -- Coos Bay Hydroelectric generators Water-power Oregon -- Coos Bay |
Date Issued: | [2009] |
Title: | Hydro-electric feasibility study at Upper Pony Creek Reservoir. |
|
---|---|---|
Alternative Title: | Coos Bay North Bend Water Board hydro-electric feasibility study and system preliminary design. | |
Name(s): |
Sol Coast Consulting & Design Parsons Brinckerhoff Coos Bay-North Bend Water Board Oregon Department of Energy. |
|
Type of Resource: | text | |
Genre: | technical report | |
Issuance: | monographic | |
Date Issued: | [2009] | |
Publisher: | Parsons Brinckerhoff | |
Place of Publication: | Portland, OR] | |
Physical Form: |
electronic resource remote |
|
Extent: | 1 online resource (68 pages) : illustrations, maps | |
Abstract/Description: | A technical, fiscal, and permitting feasibility study has been conducted for the Coos Bay North Bend Water Board pertaining to the development of hydroelectric facilities at the Upper Pony Creek Reservoir. A net-metering design for onsite use of the generated power model was selected based on projected power generation rates. The pro-forma for the project developed to reflect the preliminary build-out design, historical electricity inflation rates, and currently available tax credits and utility incentives projects a return on investment of greater than 15 years. An alternate operational scenario based on moderate industrial growth flow rates was also investigated. | |
Identifier(s): | 1017758121 (oclc) | |
Note(s): |
"November, 2009." This archived document is maintained by the State Library of Oregon as part of the Oregon Documents Depository Program. It is for informational purposes and may not be suitable for legal purposes. Under grant funding: Renewable Energy Feasibility Fund Mode of access: Internet from the Oregon Government Publications Collection. Text in English. |
|
Subject(s): |
n-us-or Hydroelectric generators -- Oregon -- Coos Bay Water-power -- Oregon -- Coos Bay Hydroelectric generators Water-power Oregon -- Coos Bay |
|
Library Classification: | 333.9140979523 Hydro2 | |
Restrictions on Access: | http://rightsstatements.org/vocab/CNE/1.0/ | |
Other Format: | Print version: Hydro-electric feasibility study at Upper Pony Creek Reservoir. Identifier: (OCoLC)651041351 | |
In Collections: |