ODOT should better scrutinize construction costs and project changes by tracking line item bids with abnormally high or low prices
Download pdf
This archived document is maintained by the State Library of Oregon as part of the Oregon Documents
Depository Program. It is for informational purposes and may not be suitable for legal purposes.
Title: | ODOT should better scrutinize construction costs and project changes by tracking line item bids with abnormally high or low prices. | |
---|---|---|
Alternative Title: |
Oregon Department of Transportation should better scrutinize construction costs and project changes by tracking line item bids with abnormally high or low prices. ODOT construction project changes. |
|
Name(s): |
Oregon Audits Division,, author,, issuing body. Oregon Department of Transportation,, author. |
|
Type of Resource: | text | |
Issuance: | monographic | |
Date Issued: | 2017 | |
Physical Form: |
electronic resource remote |
|
Extent: | 1 online resource (17 pages) : color illustration | |
Identifier(s): | 974716249 (oclc) | |
Note(s): |
Title from PDF caption (viewed on March 7, 2017). This archived document is maintained by the Oregon State Library as part of the Oregon Documents Depository Program. It is for informational purposes and may not be suitable for legal purposes. Mode of access: Internet from the Oregon Government Publications Collection. Text in English. |
|
Subject(s): |
n-us-or Oregon. Department of Transportation -- Auditing Road construction contracts -- Evaluation -- Oregon Road construction contracts -- Government policy -- Oregon Roads -- Evaluation -- Costs -- Design and construction -- Oregon Letting of contracts -- Evaluation -- Management -- Oregon Oregon Department of Transportation |
|
Held by: | Oregon State Library | |
Restrictions on Access: | http://rightsstatements.org/vocab/CNE/1.0/ | |
Is Part of Series: | Secretary of State audit report ; no. 2017-02. | |
In Collections: |